<?xml version="1.0" encoding="UTF-8"?><rss version="2.0"
	xmlns:content="http://purl.org/rss/1.0/modules/content/"
	xmlns:dc="http://purl.org/dc/elements/1.1/"
	xmlns:atom="http://www.w3.org/2005/Atom"
	xmlns:sy="http://purl.org/rss/1.0/modules/syndication/"
	xmlns:georss="http://www.georss.org/georss" xmlns:geo="http://www.w3.org/2003/01/geo/wgs84_pos#" xmlns:media="http://search.yahoo.com/mrss/"
		>
<channel>
	<title>Comments on: Gorbachev laments New World Order behind schedule, blames US for new Cold War</title>
	<atom:link href="http://aftermathnews.wordpress.com/2008/05/07/gorbachev-laments-new-world-order-behind-schedule-blames-us-for-new-cold-war/feed/" rel="self" type="application/rss+xml" />
	<link>http://aftermathnews.wordpress.com/2008/05/07/gorbachev-laments-new-world-order-behind-schedule-blames-us-for-new-cold-war/</link>
	<description>Independent Post-9/11 News</description>
	<lastBuildDate>Thu, 07 Jan 2010 01:18:53 +0000</lastBuildDate>
	<generator>http://wordpress.com/</generator>
	<sy:updatePeriod>hourly</sy:updatePeriod>
	<sy:updateFrequency>1</sy:updateFrequency>
		<item>
		<title>By: pjwalker911</title>
		<link>http://aftermathnews.wordpress.com/2008/05/07/gorbachev-laments-new-world-order-behind-schedule-blames-us-for-new-cold-war/#comment-85603</link>
		<dc:creator>pjwalker911</dc:creator>
		<pubDate>Sat, 08 Aug 2009 18:51:13 +0000</pubDate>
		<guid isPermaLink="false">http://aftermathnews.wordpress.com/?p=6253#comment-85603</guid>
		<description>Vous êtes psychopathe, même que votre héros. Staline, de faim, tués, torturés, réduits en esclavage et emprisonné des dizaines de millions de son propre peuple, sans parler de l&#039;Ukraine. Tous avec la participation financière et de &quot;soutien moral&quot; de Wall Street et de la mise en place de l&#039;élite l&#039;Amérique! Le véritable &quot;deux têtes&quot; aigle est l&#039;Ouest et l&#039;Est combinés en dictature mondiale. Stupid chatte!</description>
		<content:encoded><![CDATA[<p>Vous êtes psychopathe, même que votre héros. Staline, de faim, tués, torturés, réduits en esclavage et emprisonné des dizaines de millions de son propre peuple, sans parler de l&#8217;Ukraine. Tous avec la participation financière et de &#8220;soutien moral&#8221; de Wall Street et de la mise en place de l&#8217;élite l&#8217;Amérique! Le véritable &#8220;deux têtes&#8221; aigle est l&#8217;Ouest et l&#8217;Est combinés en dictature mondiale. Stupid chatte!</p>
]]></content:encoded>
	</item>
	<item>
		<title>By: amoussan</title>
		<link>http://aftermathnews.wordpress.com/2008/05/07/gorbachev-laments-new-world-order-behind-schedule-blames-us-for-new-cold-war/#comment-85602</link>
		<dc:creator>amoussan</dc:creator>
		<pubDate>Sat, 08 Aug 2009 18:38:13 +0000</pubDate>
		<guid isPermaLink="false">http://aftermathnews.wordpress.com/?p=6253#comment-85602</guid>
		<description>Si celui qui a liquidé l&#039;empire soviétique parcequ&#039;il s&#039;etait fait avoir par les belles paroles de democracie et des droits de l&#039;hom; utilisées toujours par l&#039;occident pour dominer les autres; se rend compte enfin qu&#039;il s&#039;est fait baiser;alors je me rejouis du reveil du peuple qui a servi de contre pouvoir face à la domination occidentale. Ce Grand peuple RUSSE qui depuis le 20 ieme siècle permet de calmer un peu les excès de l&#039;hégemonie des peuples anglosaxons et latins qui après la traite negrière; l&#039;esclavage;la colonisation ne finissent jamais d&#039;écraser les autres en avançant toujours des pretextes macabres. Vive la RUSSIE ETERNELLE et Puissante; l&#039;aigle bicephal sous l&#039;aile duquel la Chine ; la corée du nord; le vietnam et d&#039;autres peuples ont pu s&#039;affranchir réellement du joug occidental.Et honneur et rehabilitation pour le tres glorieux maréchal STALINE qui a permis par sa tenacité que MOSCOW ne plie jamais l&#039;échine. Et maudit soient kroukhtchev et et gorbachev qui ont trahi et vendu l&#039;empire par leur volonté de plaire aux occidentaux.Beni soit POUTINE qui est entrain de relever la Puissance qui est à la base de la decolonisation de milliards de personnes.</description>
		<content:encoded><![CDATA[<p>Si celui qui a liquidé l&#8217;empire soviétique parcequ&#8217;il s&#8217;etait fait avoir par les belles paroles de democracie et des droits de l&#8217;hom; utilisées toujours par l&#8217;occident pour dominer les autres; se rend compte enfin qu&#8217;il s&#8217;est fait baiser;alors je me rejouis du reveil du peuple qui a servi de contre pouvoir face à la domination occidentale. Ce Grand peuple RUSSE qui depuis le 20 ieme siècle permet de calmer un peu les excès de l&#8217;hégemonie des peuples anglosaxons et latins qui après la traite negrière; l&#8217;esclavage;la colonisation ne finissent jamais d&#8217;écraser les autres en avançant toujours des pretextes macabres. Vive la RUSSIE ETERNELLE et Puissante; l&#8217;aigle bicephal sous l&#8217;aile duquel la Chine ; la corée du nord; le vietnam et d&#8217;autres peuples ont pu s&#8217;affranchir réellement du joug occidental.Et honneur et rehabilitation pour le tres glorieux maréchal STALINE qui a permis par sa tenacité que MOSCOW ne plie jamais l&#8217;échine. Et maudit soient kroukhtchev et et gorbachev qui ont trahi et vendu l&#8217;empire par leur volonté de plaire aux occidentaux.Beni soit POUTINE qui est entrain de relever la Puissance qui est à la base de la decolonisation de milliards de personnes.</p>
]]></content:encoded>
	</item>
	<item>
		<title>By: Le nouvel ordre mondial s&#8217;affiche publiquement &#171; Les 7 du Québec</title>
		<link>http://aftermathnews.wordpress.com/2008/05/07/gorbachev-laments-new-world-order-behind-schedule-blames-us-for-new-cold-war/#comment-83495</link>
		<dc:creator>Le nouvel ordre mondial s&#8217;affiche publiquement &#171; Les 7 du Québec</dc:creator>
		<pubDate>Tue, 31 Mar 2009 04:05:02 +0000</pubDate>
		<guid isPermaLink="false">http://aftermathnews.wordpress.com/?p=6253#comment-83495</guid>
		<description>[...] - Gorbachev laments New World Order behind schedule, blames US for new Cold War [...]</description>
		<content:encoded><![CDATA[<p>[...] &#8211; Gorbachev laments New World Order behind schedule, blames US for new Cold War [...]</p>
]]></content:encoded>
	</item>
	<item>
		<title>By: Bush Sr presents Gorbachev with Liberty Medal at National Constitution Center &#171; Aftermath News</title>
		<link>http://aftermathnews.wordpress.com/2008/05/07/gorbachev-laments-new-world-order-behind-schedule-blames-us-for-new-cold-war/#comment-79463</link>
		<dc:creator>Bush Sr presents Gorbachev with Liberty Medal at National Constitution Center &#171; Aftermath News</dc:creator>
		<pubDate>Thu, 02 Oct 2008 14:51:21 +0000</pubDate>
		<guid isPermaLink="false">http://aftermathnews.wordpress.com/?p=6253#comment-79463</guid>
		<description>[...] Gorbachev laments New World Order behind schedule, blames US for new Cold War [...]</description>
		<content:encoded><![CDATA[<p>[...] Gorbachev laments New World Order behind schedule, blames US for new Cold War [...]</p>
]]></content:encoded>
	</item>
	<item>
		<title>By: pjwalker911</title>
		<link>http://aftermathnews.wordpress.com/2008/05/07/gorbachev-laments-new-world-order-behind-schedule-blames-us-for-new-cold-war/#comment-79435</link>
		<dc:creator>pjwalker911</dc:creator>
		<pubDate>Wed, 01 Oct 2008 04:15:31 +0000</pubDate>
		<guid isPermaLink="false">http://aftermathnews.wordpress.com/?p=6253#comment-79435</guid>
		<description>Sorry, I don&#039;t allow copying and pasting entire articles. But I added the link above.</description>
		<content:encoded><![CDATA[<p>Sorry, I don&#8217;t allow copying and pasting entire articles. But I added the link above.</p>
]]></content:encoded>
	</item>
	<item>
		<title>By: We The People</title>
		<link>http://aftermathnews.wordpress.com/2008/05/07/gorbachev-laments-new-world-order-behind-schedule-blames-us-for-new-cold-war/#comment-79427</link>
		<dc:creator>We The People</dc:creator>
		<pubDate>Tue, 30 Sep 2008 22:28:52 +0000</pubDate>
		<guid isPermaLink="false">http://aftermathnews.wordpress.com/?p=6253#comment-79427</guid>
		<description>Hello Chris:
Check out this &quot;Blog of the Millennium&quot;.
Seems like a MUST READ for everyone watching the current crisis.
Author gives permission to post with or w/o the commentary.  As follows:

                
The PRE-PLANNED Financial/Economic 911 of 2008
http://www.marketoracle.co.uk/Article6561.html
                              
        
WHAT:  A pre-planned collapse of the US (and global) financial and economic systems.

WHO:  The same characters who perpetrated the original 911.

WHERE:  New York City &amp; DC, of course.  Plus a sideshow in Washington state.

WHEN:  The days surrounding September 11, naturally.

HOW:  Instead of painted drones, missiles with wings &amp; big fins, and fake airplanes, they used the much more stealthy short seller.  
  
WHY:  To remake the economic/financial order of the world into a “PPP”. 

WHY Really:  Think about it !  And then ask yourself, “Cui bono?”   

    
</description>
		<content:encoded><![CDATA[<p>Hello Chris:<br />
Check out this &#8220;Blog of the Millennium&#8221;.<br />
Seems like a MUST READ for everyone watching the current crisis.<br />
Author gives permission to post with or w/o the commentary.  As follows:</p>
<p>The PRE-PLANNED Financial/Economic 911 of 2008<br />
<a href="http://www.marketoracle.co.uk/Article6561.html" rel="nofollow">http://www.marketoracle.co.uk/Article6561.html</a></p>
<p>WHAT:  A pre-planned collapse of the US (and global) financial and economic systems.</p>
<p>WHO:  The same characters who perpetrated the original 911.</p>
<p>WHERE:  New York City &amp; DC, of course.  Plus a sideshow in Washington state.</p>
<p>WHEN:  The days surrounding September 11, naturally.</p>
<p>HOW:  Instead of painted drones, missiles with wings &amp; big fins, and fake airplanes, they used the much more stealthy short seller.  </p>
<p>WHY:  To remake the economic/financial order of the world into a “PPP”. </p>
<p>WHY Really:  Think about it !  And then ask yourself, “Cui bono?”</p>
]]></content:encoded>
	</item>
	<item>
		<title>By: pjwalker911</title>
		<link>http://aftermathnews.wordpress.com/2008/05/07/gorbachev-laments-new-world-order-behind-schedule-blames-us-for-new-cold-war/#comment-79155</link>
		<dc:creator>pjwalker911</dc:creator>
		<pubDate>Fri, 19 Sep 2008 19:10:37 +0000</pubDate>
		<guid isPermaLink="false">http://aftermathnews.wordpress.com/?p=6253#comment-79155</guid>
		<description>You are missing the main point, that this is a GLOBAL system, not an American system. America has been used to spearhead the New World Order and now the torch is to be passed on to others. Stop believing the illusion that countries are at odds with each other. They are no more at odds than the Republican and Democratic parties are at odds with each other. The stated goal of the elite was always to unify the Americas with the Soviet system. The &quot;Fall of Communism&quot; was nothing but a ruse for the commoners. You are a fool to fall for this con-game.</description>
		<content:encoded><![CDATA[<p>You are missing the main point, that this is a GLOBAL system, not an American system. America has been used to spearhead the New World Order and now the torch is to be passed on to others. Stop believing the illusion that countries are at odds with each other. They are no more at odds than the Republican and Democratic parties are at odds with each other. The stated goal of the elite was always to unify the Americas with the Soviet system. The &#8220;Fall of Communism&#8221; was nothing but a ruse for the commoners. You are a fool to fall for this con-game.</p>
]]></content:encoded>
	</item>
	<item>
		<title>By: Reggie</title>
		<link>http://aftermathnews.wordpress.com/2008/05/07/gorbachev-laments-new-world-order-behind-schedule-blames-us-for-new-cold-war/#comment-79145</link>
		<dc:creator>Reggie</dc:creator>
		<pubDate>Fri, 19 Sep 2008 12:30:46 +0000</pubDate>
		<guid isPermaLink="false">http://aftermathnews.wordpress.com/?p=6253#comment-79145</guid>
		<description>The decline of USSR in the early 90&#039;s  seems to have removed the last vestiges of self-control from America, which from that time started to take active part in C. Europe wars, bomb Yugoslavia, start wars, create bases everywhere, in short, seeming to embark on a planet-control crusade, zeroing in on what would secure it: oil and natural gas. Via these energy sources, it thought it could also control militarily and politically what goes on in the world, which makes a lot of sense. 

The only hope of a decrease in fascist America&#039;s development is a healthier Russia.</description>
		<content:encoded><![CDATA[<p>The decline of USSR in the early 90&#8217;s  seems to have removed the last vestiges of self-control from America, which from that time started to take active part in C. Europe wars, bomb Yugoslavia, start wars, create bases everywhere, in short, seeming to embark on a planet-control crusade, zeroing in on what would secure it: oil and natural gas. Via these energy sources, it thought it could also control militarily and politically what goes on in the world, which makes a lot of sense. </p>
<p>The only hope of a decrease in fascist America&#8217;s development is a healthier Russia.</p>
]]></content:encoded>
	</item>
	<item>
		<title>By: pjwalker911</title>
		<link>http://aftermathnews.wordpress.com/2008/05/07/gorbachev-laments-new-world-order-behind-schedule-blames-us-for-new-cold-war/#comment-74965</link>
		<dc:creator>pjwalker911</dc:creator>
		<pubDate>Sat, 10 May 2008 02:08:33 +0000</pubDate>
		<guid isPermaLink="false">http://aftermathnews.wordpress.com/?p=6253#comment-74965</guid>
		<description>People are bleating sheep for the most part. They never have the intellectual fortitude to scratch beneath the surface and try to understand the big picture. They believe very strongly in the theatrical performances of the various world leaders who are working a Good Cop/Bad Cop con-game on them the whole while.

Sheople willingly absorb propaganda from both sides of the dialectic and thus believe that they must choose up sides and are herded accordingly, all the while never suspecting that the elites at the top on both sides are working together for the same goal. 

I beg people to wake up, but they seldom do and basically refuse to, preferring willful ignorance to truth.</description>
		<content:encoded><![CDATA[<p>People are bleating sheep for the most part. They never have the intellectual fortitude to scratch beneath the surface and try to understand the big picture. They believe very strongly in the theatrical performances of the various world leaders who are working a Good Cop/Bad Cop con-game on them the whole while.</p>
<p>Sheople willingly absorb propaganda from both sides of the dialectic and thus believe that they must choose up sides and are herded accordingly, all the while never suspecting that the elites at the top on both sides are working together for the same goal. </p>
<p>I beg people to wake up, but they seldom do and basically refuse to, preferring willful ignorance to truth.</p>
]]></content:encoded>
	</item>
	<item>
		<title>By: t wolf</title>
		<link>http://aftermathnews.wordpress.com/2008/05/07/gorbachev-laments-new-world-order-behind-schedule-blames-us-for-new-cold-war/#comment-74964</link>
		<dc:creator>t wolf</dc:creator>
		<pubDate>Sat, 10 May 2008 00:19:13 +0000</pubDate>
		<guid isPermaLink="false">http://aftermathnews.wordpress.com/?p=6253#comment-74964</guid>
		<description>well i would like to think that Gorbachev always
knew that you can&#039;t trust Fascist Bourgeoise
administrations here in the US,especially since
state sponsored terrorism and war are the best
artificial means to provide artificial maintenence
on our   mono-Capitalistic economy,as you can 
see nothing changes (wall or no wall)</description>
		<content:encoded><![CDATA[<p>well i would like to think that Gorbachev always<br />
knew that you can&#8217;t trust Fascist Bourgeoise<br />
administrations here in the US,especially since<br />
state sponsored terrorism and war are the best<br />
artificial means to provide artificial maintenence<br />
on our   mono-Capitalistic economy,as you can<br />
see nothing changes (wall or no wall)</p>
]]></content:encoded>
	</item>
</channel>
</rss>
